Appendix - A - SELECTED INVESTMENT PLAN
A.1 INTRODUCTION
The Investment Plan for Gelephu is prepared as a part of the Gelephu Structure Plan, with the prime objective of the long-term wellbeing of the people of Gelephu and their environment, through an innovative approach and the provision of cost-effective services.
To ensure sustainable communities and bring about lasting improvements to quality of life of individuals, families and neighborhoods, we need integrated policies, investment and action across a range of economic, social, physical and environmental issues.
This coordinated approach aims to deliver
This leads to an approach of making a balanced infrastructure investment program.
The Program will
The main goal is to achieve improved quality of life, increased environmental and health protection, reduced levels of homelessness and improved community well-being.
The main sectors of investment would be:
1. Environmental Infrastructure:
2. Transportation Infrastructure :
3. Social Infrastructure:
The investment will benefit in the form of
A.2 EXECUTIVE SUMMARY
The preparation of the Gelephu Structure Plan is the primary task of the Department of Urban Development and Engineering Services (DUDES) under the Ministry of Works and Human Settlement (MoW&HS), Royal Government of Bhutan (RGoB). This Investment Plan Report presents and discusses projects which are proposed as a part of the Gelephu Structure Plan.
Proposals for action have been proposed along with the projects on-going and future planned [as mentioned in Gelephu Structure Plan – 3.9]. Looking at the demographic studies it reveals that population will reach a figure of 32,500 to 60,000 by the year 2025 [Reference: Chapter -4, Demographic Studies and Planning Standards, Gelephu Structure Plan].
The Investment Plan proposal can act as a reference to plan carefully, to take care of the infrastructure needs of this growing population. This Plan deals in detail with infrastructure projects. It aims to help various departments to work together more efficiently and to execute the projects in a coordinated way and to provide greater transparency for the community on the infrastructure strategies and projects. Along with this process the implementing authority should also stress on the issues of maintenance and of implication for the provision of new infrastructure; on the possibilities for multi-year budgeting for infrastructure projects, and on new technologies and their implications for infrastructure. influencing project choice
While proposing the proposals for action three major criteria are used to assess the merits of an infrastructure project.
They should:
• Meet a clear social need;
• Be consistent with existing government policies and requirements; and
• Produce more benefits than costs.
The community’s need for an infrastructure project may emerge from a number of factors. The report takes in to consideration population factor: population growth, population movements and the characteristics of new population distribution. The community’s need for infrastructure may also stem from the demands of economic change over and above that required simply to sustain a growing population.
The Gelephu Structure Plan is prepared considering four key policy points within which strategies, plans, initiatives and individual infrastructure projects would fit.
These are:
• Integrating environment protection into all activities;
• Encouraging economic development and employment growth;
• Achieving greater social justice for all members of the community and creating livable towns; and,
• Delivering more financially responsible programs that reduce public debt and unfunded liabilities.
Some of the most important initiatives aimed at helping, meet these commitments are:
• Reducing pollution from storm water and sewage;
• Integrating land use and transport planning;
• Investing in information technology infrastructure;
• Improving access to affordable housing; and
• Enhancing recreational and cultural infrastructure.
The Investment Plan specifies the proposed projects and recommendations that will deliver these initiatives.
As per the analysis of the proposed projects mentioned in the ‘Proposals for Action’, the Investment for the Gelephu Town (within the proposed extended municipal boundary limits) will be about Nu. 1,066.24 Million (or, USD 24.51 Million) up to the year 2025, for the projects various SECTORS.
A.3 PROPOSED PROJECTS : COST ESTIMATED (SECTOR WISE)
Gelephu Structure Plan proposes various projects under the following SECTOR heads. The cost estimates are carried out for the same projects.
A.3.1 Utilities and Infrastructure
The main objective of the proposed Water Supply System is to
Considering this framework, the following system of supply is proposed:
Flow Diagram of the proposed water supply network system
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Water Supply Scheme and Network System |
255.29 |
5.869 |
97.883 |
73.927 |
41.058 |
42.420 |
The costing for the Water Supply System is arrived at considering the proposed system of flow from source to the intermediate reservoirs and then to the distribution expected within the proposed municipal limits. Pricing of the water supply consumption should be as per the metered consumption for each unit and would vary according to the precinct it is located in. A detailed pricing mechanism could be evolved for different grades of development and income groups as per the density of the development. Looking at the proposed systems, there would be a phase-wise expansion of the current manpower capacities engaged in the management and maintenance of the urban water supply network, to cover and manage the other recommended treatment plants and other facilities in the outlying areas.
Conclusion
The estimated cost for the entire water supply network system for Gelephu (with the extended municipal limits) is Nu. 255.29 million. This is a huge expenditure, but it is a necessity looking at the overall progress of the town. The entire scheme of implementation of the water supply system should be worked-out taking into consideration the amount to be invested and amount to be recovered from the consumers. At the same time the manpower and maintenance tasks have to be considered, as the system would have different control points. The implementing authority must establish this mechanism.
A.3.1.2 Sewerage Management System
The main objective of the proposed Sewerage Management System is to
For the purpose of facilitating an efficient sewerage System, the network lines which come from the territories to come at a point where pathways are proposed and then the lines follow the pathway running along the rivulets to the treatment plants. This pathway alignment will enable to locate the lines for maintenance and would also provide an access to the manholes.
Table A.2 : Summary Of Cost Estimates of the Proposed Project for Sewerage Management System
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Sewerage Management and Network System |
109.45 |
2.516 |
37.152 |
22.241 |
30.896 |
19.159 |
The costing for the Sewerage Management System is arrived at considering the various projects mentioned and the mechanism proposed for the same.
Conclusion
The estimated cost for the entire sewerage network system for Gelephu (with the extended Town limits) is Nu. 109.45 million. It is a large expenditure over the years but it is a necessity looking the overall progress of the town. The entire scheme of implementation of the sewerage network system should be worked-out taking into consideration the amount to be invested, and the amount to be recovered from the consumers. At the same time enough manpower and maintenance tasks have to be considered as the system would have different control points. An appropriate mechanism for implementation must be established by the implementing authority.
A.3.1.3 Storm Water, River Training and Flood Protection
The main objective of the proposed Storm Water Drainage System is to:
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Storm Water, River Training and Flood Protection |
210.85 |
4.847 |
73.536 |
63.588 |
47.909 |
25.817 |
The costing for the Storm Water Drainage System is arrived considering the various projects mentioned in the Utilities and Infrastructure report.
Conclusion
The estimated amount for the entire storm water, river training and flood protection for Gelephu (with the extended municipal limits) is Nu. 210.85 million. It is a large expenditure over the years but it is a necessity looking to the overall progress of the town.
A.3.1.4 Solid Waste Collection and Disposal Systems
The proposed Solid Waste Collection and Disposal System aim at
The main objective of the proposed Solid Waste Collection and Disposal System is to
Table A.4 : Summary Of Cost Estimates of the Proposed Solid Waste Collection And Disposal System
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Solid Waste Management System |
48.970 |
1.126 |
15.282 |
11.161 |
11.264 |
11.264 |
Conclusion
The estimated amount for the entire solid waste management system for Gelephu (with the extended municipal limits) is Nu. 48.97 million. It is a large expenditure over the years but it is a necessity looking to the overall progress of the town. All the projects mentioned aims to minimize and manage the volume of the solid waste collected at the landfill site. Introduction of strict monitoring system, introduction of public participation and privatization of the solid waste management, will minimize the responsibilities and ease the management process for the Gelephu Municipal Corporation. These systems will also induce awareness among the public.
A.3.1.5 Electrical [Power] Distribution System
The main objective of the proposed Electrical Power Distribution System is to:
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Electrical Distribution System |
119.291 |
2.742 |
74.002 |
15.354 |
22.453 |
7.483 |
Pricing of the electrical distribution system should be worked-out as per the number of connections [by strict monitoring] and the investment to be done for the systems.
Conclusion
The estimated amount for the entire electrical distribution system for Gelephu (with the extended Town limits) is Nu. 119.291 million. It is a large expenditure over the years, but it is a necessity looking at the overall progress of the town. The entire scheme of implementation of the electrical distribution system should be worked-out taking into consideration the amount to be invested and amount to be recovered from the consumers. Separate facilities to be established by the implementing authority.
A.3.1.6 Street Lighting
The main objective of the proposed Street Lighting System is to:
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Street Lighting |
31.784 |
0.731 |
8.380 |
10.535 |
6.028 |
6.842 |
The costing for the Street Lighting System is arrived considering the various transportation projects proposed.
Conclusions
The estimated amount for the entire street lighting system for the Gelephu Town (with the extended Town limits) is Nu. 31.784 million. It is a large expenditure over the years but it is a necessity looking the overall traffic condition of the town. The entire scheme of implementation of the street lighting system should be worked-out taking into consideration the immediate requirements.
A.3.1.7 Telecommunication System
The main objective of the proposed Telecommunication System is to:
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Telecommunication system |
40.867 |
0.939 |
13.309 |
10.738 |
10.625 |
6.195 |
Note: For detailed calculation please refer to Table A.16 at the end of this Appendix
The costing for the Telecommunication System is arrived considering the various proposed tasks. Accordingly, the entire planning network would have to be done from each of the proposed Urban Village roads after executing a detailed survey.
Conclusion
The estimated amount for the entire telecommunication system for Gelephu (with the extended Town limits) is Nu. 40.867 million. It is a large expenditure over the years but it is a necessity looking the overall demand of the town and its extended limits. The entire scheme of implementation of the telecommunication system should be worked-out taking into consideration a detailed survey of the immediate requirements and also the future demand.
A.3.1.8 Transportation System
The main objective of the proposed transportation system is to:
Sector |
Estimated Cost (Nu.) (in million) |
Estimated Cost ( US $ ) (in million) |
Phase One 2005-2010 (in million) |
Phase Two 2011-2015 (in million) |
Phase Three 2016-2020 (in million) |
Phase Four 2021-2025 (in million) |
Transportation System |
238.28 |
5.478 |
72.621 |
82.428 |
41.720 |
41.511 |
Note: For detailed calculation please refer to Table A.18 at the end of this Appendix
The costing for the Transportation System is arrived taking into consideration the town’s present situation. A detailed survey has to be executed on the proposed roads and further make a study on its implication on the surrounding areas of the roads.
Conclusion
The estimated amount for the entire transportation system for the Gelephu Town (with the extended Town limits) is Nu. 238.28 million. It is a large expenditure over the years but it is a necessity looking the overall traffic movements of the Town, its extended limits and the safety of the public. The entire scheme of implementation of the transportation system should be worked-out taking into consideration a detailed survey of the immediate requirements and also of the future demand.